Ductmate Industries
Menu
Close
  • Home
  • News
  • Company
    • Overview
    • History
    • Careers
  • DeMI Login
  • Why Ductmate?
  • Products
  • Services
  • Technical Resources
  • Our Distributors
    • US Distributors
    • Find an International Distributor
    • Become A Distributor
  • Contact
800.990.8459
Login
Login below or Request Access to view all related resources.

Lost your password?
Forgotten Password
Cancel
  • Home
  • News
  • Company
    • Overview
    • History
    • Careers
  • DeMI Login
  • Why Ductmate?
  • Products
  • Services
  • Technical Resources
  • Our Distributors
    • US Distributors
    • Find an International Distributor
    • Become A Distributor
  • Contact

Blog

Spiralmate Round Duct Connector System Working Great in South Dakota

Spiralmate completing a round duct connection

Posted on October 24, 2017 by Ductmate Industries

The Prairie Lakes Wellness Center in Watertown, SD, a modern community center conveniently located in the fastest-growing area of Watertown, opened in April 2017 and features 104,000 square feet of space. The $24 million multi-level facility features multiple basketball courts, racquetball courts, a running track, a sauna and whirlpool, a large fitness area, and a state-of-the-art pool area that includes a leisure pool and a competition pool.

Choosing the Right System for Aesthetics & Performance

For areas that are not exposed, rectangular, medium-pressure ductwork was chosen. For exposed areas, the SpiralmateĀ® Round Duct Connection System was used. Ductmate Industries manufactured all the spiral connections.

Gary Chappell, Ductmate Regional Channel Manager, stated that the spiral ductwork is exposed and visible from multiple angles. On the second floor, where the ceiling downstairs is positioned at eye level, it was even more important to have an attractive product. Chappel said, ā€œThe project is aesthetically pleasing both close up and from a distance. From a performance standpoint, the system is airtight, efficient and doesn’t require any additional sealing.”

Jon Burri, Vice President at Creative Metal Solutions, the specifier and fabricator for this project, said everything went very smoothly on the job site. ā€œWe made custom lengths in the shop and delivered them to the jobsite, ranging in size from as large as 42ā€ in diameter to as small as 10ā€ in diameter. Large amounts of 28-32ā€ ductwork were installed above the track, and 18-20ā€ inch segments were installed in the workout areas.ā€

The ductwork in the pool area was constructed from double-walled aluminum to reduce the sound of the airflow from spectators and prevent corrosion from the harsh pool environment. Galvanized steel was used on all the ductwork in other areas.

MacArthur Co. was the distributor for this project. According to Chappell, ā€œThey have been a great asset and long-standing Ductmate distributor in Sioux Falls.ā€

Burri said that a couple of trailers of product were sent to the jobsite on and off for about six months. ā€œWe delivered in phases so that a lot of room wasn’t needed to store product during the entire job,ā€ he said.

The company always recommends the SpiralmateĀ® system because, Burri said, ā€œThe cost is always justified with savings in field installation time and cost, and it allows for an air-tight system that looks great.ā€

Faster Installation, Big Labor Savings
Active Heating, Inc., based in Watertown, S.D., was the HVAC contractor. Jason Roehrich, Vice President at the company, said the installation of the SpiralmateĀ® system is usually fast, but this project went even faster than normal.

ā€œThe finished job features a wide-open, exposed look with neat, straight long runs,ā€ he said. ā€œIn one area, we had a run of 100-150 feet with a 90-degree turn into another long run of about 300 feet, and it looks great.ā€

Roehrich added, ā€œOur installers in the field really like the SpiralmateĀ® system because it quickly snaps in place, provides a great seal, installs faster than other products, and it provides a straight, clean look when it’s finished.ā€

Another advantage of the system is that when a piece of ductwork is cut down in size, the flange can be removed and reused—unlike with other systems. This saves even more time and money.

The result was a successful project for Ductmate and everyone else involved. The state-of-the-art Prairie Lakes Wellness Center features an HVAC system that’s pleasing to the eye, energy-efficient, and will perform well for many years to come.

Share on:
  • Facebook
  • Twitter
  • Google Plus
  • LinkedIn

Categories

  • Newsletter Recap
  • Ductmate News
  • Product News
  • Case Study
  • Events
  • Industry News

Archives

Tags

  • rectangular duct connector
  • adhesives
  • access doors
  • round duct connector
  • newsletter recap
  • case study
  • sealants
  • trade shows
  • insulation
  • sustainability
  • distributor training
  • hangers and hanging systems
  • industry news
  • product announcement
  • other
  • gasket

Corporate Office

Charleroi, PA

210 Fifth Street
Charleroi, PA 15022

Phone: 800-990-8459

Fax: 724-258-5494

Contact Us

Manufacturing Locations

E. Monongahela, PA

1502 Industrial Drive
E. Monongahela, PA 15063

Phone: 724-258-0500

Lodi, CA

810 S Cluff Avenue
Lodi, CA 95240

Phone: 209-333-4680

Wagoner, OK

300 SE 15th Street
Wagoner, OK 74467

Phone: 918-201-7022

Interested in staying up to date with the latest Ductmate news and product information

Subscribe to Our Newsletter

    Social

Copyright © Ductmate Industries 2026. All rights reserved.

Privacy Policy